Dec 26, 2025 Languages : English | ಕನ್ನಡ

Bengaluru Power Cut On December 24: BESCOM Announces Power Outages In More than 80+ Areas

Residents and businesses in South and West Bengaluru are advised to prepare for significant power outages this week. The Bangalore Electricity Supply Company Limited (BESCOM) and Karnataka Power Transmission Corporation Limited (KPTCL) have announced a series of scheduled maintenance works aimed at upgrading infrastructure and preventing winter breakdowns.

Bengaluru Power Cut On December 24 | Photo Credit: AI Image
Bengaluru Power Cut On December 24 | Photo Credit: AI Image

Major Outage on Wednesday, December 24

On Wednesday, December 24, 2025, power supply will be interrupted from 10:00 AM to 4:00 PM (and in some areas until 5:00 PM) to facilitate quarterly maintenance at the Padmanabhanagar, Subramanyapura, and ISRO Layout stations.

List of Affected Areas (Dec 24)

Category Localities Impacted
South Bengaluru Core Banagiri Nagar, Pappaiah Garden, Balaji Choultry area, Siddamma & Siddaiah Reddy area, 30th Main & 30th Cross, BNM College, BDA Complex, Devagiri Temple, BSNL Office, BSK 2nd Stage.
Padmanabhanagar Zone SLV Hotel to 24th Cross, Upahara Hotel area, Chennammanakere Achukattu, Manjunath Colony, BMTC Depot, Rajiv Nagar, Syndicate Bank Colony, Raghavendra Layout, Maharaja Hospital, Laxmikantha Choultry, and Puttalingaiah Road.
ISRO & Subramanyapura ISRO Layout (Phases 1, 2, & 3), Kumaraswamy Layout, Ilyasnagar, Venkateshwara Colony, Gangadhar Layout, Chandra Nagar, Rajeshwari Nagar, Bhuvaneshwari Nagar, Ideal Homes, Ganapathi Temple, Bendre Nagar, and Kanaka Layout.

Extended 4-Day Power Cut (Dec 25–28)

Starting from Christmas Day (Dec 25) through December 28, BESCOM has initiated a specialized 12-hour daily outage (6:00 AM to 6:00 PM) for the Attibele and Anekal zones. This is to replace existing lines with High-Temperature Low-Sag (HTLS) conductors to improve grid capacity.

Affected areas include: Yadvanahalli, Attibele Industrial Area, Mayasandra, Dasanapura, Anekal Town, and surrounding villages.

How to Prepare

To minimize the impact of these outages, BESCOM suggests the following:

  • Charge Devices: Ensure mobile phones, laptops, and power banks are fully charged before 10:00 AM.
  • Water Storage: Fill overhead tanks and sumps early, as electric pumps will be non-functional.
  • Appliance Safety: Switch off high-power appliances (ACs, refrigerators) before the outage to avoid damage from voltage fluctuations during restoration.
  • Lifts and Elevators: Avoid using lifts near the start and end of the outage window to prevent being stranded.

Helpline & Support

For real-time updates or to report specific issues, residents can reach out via:

  • BESCOM Helpline: 1912
  • WhatsApp Support (South Zone): 8277884011