Friday, Nov 20, 2026
|
Advertisement

Mumbai Airport Shuts Both Runways for Six Hours Today for Post-Monsoon Maintenance

Both runways at Mumbai’s Chhatrapati Shivaji Maharaj International Airport (CSMIA) will be closed today, as part of the annual post-monsoon maintenance programme.

Chhatrapati Shivaji Maharaj International Airport
Chhatrapati Shivaji Maharaj International Airport | Photo Credit: https://en.wikipedia.org/wiki/Chhatrapati_Shivaji_Maharaj_International_Airport

Flights (including all takeoffs and landings) have been suspended for six hours between 11 am IST and 5 pm IST. Primary runway RWY 09/27 and secondary runway RWY 14/32 will remain closed during this time while inspections and repairs are carried out on them.

Advertisement

Runway surface checks and repairs; lighting system assessment; marking renewal or inspection; friction testing; removal of rubber deposits left by aircraft tyres; drainage channel clearance these are some of the tasks that CSMIA carries out under its year-round operational readiness programme to ensure safety, reliability and compliance with international aviation standards after monsoon. 

Mumbai International Airport Limited (MIAL) had issued a Notice to Airmen (NOTAM) well in advance and coordinated with airlines and agencies to reschedule flights and minimise disruption. People travelling to or from Mumbai today should check flight status and timings with their airline before leaving for the airport, as domestic and international flights arriving/departing between 11 am and 5 pm may be affected by the closure of the runway.

The closure does not mean that all flights are cancelled for the day or that the airport remains shut all day long. Operations outside the six-hour maintenance window are expected to continue, and normal flight movements will resume once work is completed and clearances received.

This annual exercise is routine at one of the world’s busiest single-runway airports, which sees a high volume of daily air traffic movements. Authorities are concentrating on both intersecting runways simultaneously so that surface integrity and technical infrastructure can be restored within the specified window.

Advertisement

In another development related to future operations, airport authorities have given slots only to 38 foreign airlines out of 50 they had sought for Summer 2027 schedule. This is in the backdrop of renovation work at Terminal 1 at CSMIA which might see some international flights shifted to Navi Mumbai International Airport. Several foreign carriers have opposed the move.

Both Mumbai and Navi Mumbai airports are owned by Adani Airport Holdings Limited (AAHL) while day-to-day management of CSMIA is done by Mumbai International Airport Limited. Travellers should check schedules early and allow extra time as the runway will be closed only for six hours and once maintenance is over and clearance is given flight operations will resume as usual.

Comments